1) Temperature and alarm sensor for pumps
2) Monitoring system for hydrocarbon gas
3) Bilge level monitoring devices
4) Interlock for lighting and ventilation.
5) Cargo pump room should be mechanically ventilated and the capacity should be 20 air
changes per hr of the volume of the pump room.
6) Pump room bulkhead with ER should be class A-0.
7) Spray shield around pump seals
8) In order to avoid static electricity cargo is loaded directly into tanks ,the loading pipes as far
as practicable should be led to the lowest area.
9) Exd – light covers
10) Height of double bottom in PR - B/15 or 2 meter whichever is less but not less than 1 mtr.
11) An emergency intake located above 2m , the PR lower grating. The emergency intake
should have damper fitted which is capable of being opened and closed from exposed main
deck and grating level. – 15 air changes per hour.
12) Fixed sampling line to attach portable gas meter
13) Temp monitoring for bulkhead seal
2) Monitoring system for hydrocarbon gas
3) Bilge level monitoring devices
4) Interlock for lighting and ventilation.
5) Cargo pump room should be mechanically ventilated and the capacity should be 20 air
changes per hr of the volume of the pump room.
6) Pump room bulkhead with ER should be class A-0.
7) Spray shield around pump seals
8) In order to avoid static electricity cargo is loaded directly into tanks ,the loading pipes as far
as practicable should be led to the lowest area.
9) Exd – light covers
10) Height of double bottom in PR - B/15 or 2 meter whichever is less but not less than 1 mtr.
11) An emergency intake located above 2m , the PR lower grating. The emergency intake
should have damper fitted which is capable of being opened and closed from exposed main
deck and grating level. – 15 air changes per hour.
12) Fixed sampling line to attach portable gas meter
13) Temp monitoring for bulkhead seal